Bell’s Building Information Modeling (BIM) Department drives performance in the field and enables our on-site Project Managers to deliver the highest quality work on-time and within budget. Bell collaborates with the General Contractor or Construction Manager and trade subcontractors to create a fully integrated model. This model assists with identifying design conflicts, errors, and omissions prior to construction.
Our modelers use best practices and techniques and the latest software, including:
The benefits of BIM are:
Quality improvement - BIM allows the mechanical contractor to perform constructability reviews during the design phase. Clash-free BIM models ensure our craftsmen can prefabricate and install all mechanical/plumbing systems correctly the first time.
Schedule BIM eliminates rework during the construction phase and keeps the schedule progressing. BIM allows for more efficient use of material, labor, and pre-fabrication planning, reducing schedule timelines.
Cost reduction. BIM-based constructability reviews and clash detection avoid rework, and identifies any structural and architectural conflicts that may result from major equipment sizing and orientation. BIM increases prefabrication and captures its cost benefits.