Quantum Catalytic Extraction Process Ion Exchange Resin

Oak Ridge, Tennessee
Back
Owner
Scientific Ecology Group, Inc. / Molten Metal Technology
General Contractor
Bell
Schedule Duration
03/1995
to
01/1996
Architect / Engineer
Bell
Mechanical Subcontract Value
$
10
M
Awards

Project Overview

This facility supports the processes for the proprietary Molten Metal Technology.

Bell designed and installed foundations, floors, shield structure, interior walls, feed preparation, process water, cooling water, compressed air, high pressure oxygen, nitrogen and natural gas, HVAC, HEPA filter system, fire protection, electrical and instrumentation control, as well as the setting and inter-connection of the Owner-supplied equipment skids.