P-383 Controlled Industrial Facility (CIF)

Portsmouth, VA
Back
Owner
U.S. Navy
General Contractor
MEB Contractors
Schedule Duration
01/2013
to
01/2016
Architect / Engineer
Mechanical Subcontract Value
$
6.5
M
Awards

Project Overview

P-383 Controlled Industrial Facility

Bell performed the Mechanical, Plumbing and Process Piping Scopes of Work for the construction of an approximately 50,000 square foot Controlled Industrial Facility (CIF). The CIF is intended to support maintenance and repair services for Navy vessels.

The structure incorporates specialized systems, equipment, materials, and construction designed to contain, handle, and process liquid waste. The facility includes a Controlled Area (with a high bay work area and smaller rooms), a two-story administrative Support Area, and an Enclosed Storage Area (ESA). Controlled Areas are built of specialized concrete construction and include stainless steel tanks, equipment, and systems for processing liquid waste.

The liquid waste processing system consists of stainless steel ASME BPVC-compliant tanks and piping fabricated and installed to rigid standards of quality and system materials.