Lucy Beckham High School

Mount Pleasant, SC
Back
Owner
Charleston County School District
General Contractor
Contract Construction
Schedule Duration
08/2018
to
02/2020
Architect / Engineer
McMillan, Pazdan, Smith / RMF Engineering
Mechanical Subcontract Value
$
11.4
M
Awards

Project Overview

Bell performed the Mechanical and Plumbing scopes of work at the Lucy Garrett Beckham High School in Mount Pleasant, South Carolina. This project is a new construction, three-story, fully sprinkled, 242,500 square foot high school (1,500 student). The facility has two gymnasiums, a performing arts auditorium, multiple CTE labs, full media center, computer labs, and outdoor sports facilities.

A direct air to air HVAC system was used for the majority of the spaces with a separate make-up air system providing outside air.

Mechanical Systems and Equipment Include:

  • (10) Air Handling Units (totaling 187,430 CFM)
  • Five (5) Exchangers
  • Three (3) Chillers (totaling 705 tons)
  • (20) Split System Air Conditioning Units (totaling 50 tons)
  • Main Atrium Smoke Evacuation System
  • Technology Room Dust Collection System
  • Kitchen Supply and Exhaust System
  • Laboratory Supply, Exhaust, and Control System