Bell performed the mechanical, plumbing and process piping scope of work for the construction of an approximately 50,000 square foot Controlled Industrial Facility (CIF) located in Portsmouth, VA. The newly completed CIF supports maintenance and repair services for Navy vessels. The facility incorporates specialized systems, equipment, materials, and construction designed to contain, handle, and process liquid waste. It also includes a Controlled Area (with a high bay work area and smaller rooms), a two-story administrative Support Area, and an Enclosed Storage Area (ESA). The Controlled Areas are built of specialized concrete construction and contain stainless steel tanks, equipment, and systems for processing liquid waste.
Bell was the mechanical and plumbing design-assist subcontractor on the University of Virginia - University Hospital Expansion (UVA-UHE) project in Charlottesville, VA. Bell's team at UVA-UHE was led by Senior Project Manager, Phil Hull. This project is featured in the linked article.
Beginning Tuesday, Oct. 19, there is a new entrance for the Emergency Department (ED) at Carilion Roanoke Memorial Hospital (CRMH). Bell is the Mechanical and Plumbing Design-Assist Subcontractor for the Crystal Springs Tower project at Carilion Roanoke Memorial Hospital. The project consists of multiple phases of work to enable the tower construction.